In advance of each stage of the project commencing, National Grid will notify District Councillors, Parish Councils and residents, businesses and landowners within a certain distance of the construction site.įor the latest information regarding the project, the National Grid’s website.The Priority Services Register (PSR) is free to join. The Council will discharge the ‘requirements’ and will need to consult a number of statutory consultees in the process. Submissions located in Sedgemoor will be made available via the Council’s Planning Online website. These are called ‘requirements’ and are similar to planning conditions. The Development Consent Order requires National Grid to seek approval from Somerset Council for specific details prior to the start of each of the 3 construction stages of the project. The works will consist of the installation and removal of temporary works (bellmouths, haul roads and working platforms), the permanent installation of the 400kV underground cable and Cable Sealing End compound, low overhead line pylons and associated conductors, and the removal of existing 400kV overhead line conductors. Works will commence towards the end of 2022 and be completed in 2025. Sedgemoor is involved in 3 of the stages, detailed below: The scheme will be completed in 14 stages, with the removal of the existing overhead lines and the reinstatement of the haul roads, site compounds and vehicular access points being the later stages. This planting is known as the ‘Off-Site Planting and Mitigation Scheme’ (OSPES) and must be completed as part of a legal agreement between National Grid and the Local Authorities. New planting will screen certain parts of the development and additional planting will be undertaken within a 3km zone of the route to reduce the overall impact of the new connection and enhance local landscape and biodiversity. To make way for the new connection, and to minimise the impact on the local landscape, 65km of the existing Western Power Distribution overhead 135,000 volt lines will be removed.Īssociated works include the formation of haul roads, site compounds and new access points (bellmouths) off the public highway for construction traffic. Cable Sealing Ends, similar in appearance to a small sub-station, will be constructed at the point where overhead lines join the underground cables. 8.5 km of cabling will be laid underground passing under the River Axe and continuing through the Mendips. The project comprises the erection of 48.5 km of new 400,000 volt overhead lines. The route goes through these council areas – Bristol City Council, North Somerset Council, Somerset Council and South Gloucestershire Council. Full details of the Development Consent Order (DCO) are available on the Planning Inspectorate’s website. National Grid gained development consent on 19 January 2016 from the Secretary of State for Energy and Climate Change (now the Department for Business, Energy & Industrial Strategy) to build a new high voltage electricity transmission between Bridgwater to Seabank in Avonmouth to connect Hinkley Point C to the National Grid. Please note that the documents on this page may not comply with WCAG 2.1 AA standards.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |